Custom cabinetry, specified for professional projectsSpecification guideFor the tradeStart a project
ARCAYACABINETRY
Start a project
MenuClose
For architects, designers & project teams

Your design intent.
A coordinated cabinetry brief.

Develop custom cabinetry from a coordinated design brief. Bring the room layout, door language, materials and functional details together, then carry the agreed choices through drawing review, sample approval and project delivery.

Design rendering of a kitchen combining a timber-toned island and light perimeter cabinets
California kitchen case study / Arcayaliving
01 / Working together

Keep design decisions connected.

The review works best when every input has a matching output. Agree the design services, measurement responsibilities and approval stages for the project before detailed work begins.

  1. 01
    Brief
    From your team

    Plans, room list, destination and design references

    Proposed review output

    Scope and open-question checklist

  2. 02
    Specification
    From your team

    Preferred finishes, hardware and constraints

    Proposed review output

    Coordinated component and finish schedule

  3. 03
    Technical review
    From your team

    Approved site measurements and interfaces

    Proposed review output

    Drawing revision and approval record

  4. 04
    Pre-production
    From your team

    Agreed samples and final quantities

    Proposed review output

    Approved specification and inspection checkpoints

  5. 05
    Delivery planning
    From your team

    Site access, installer and destination details

    Proposed review output

    Packing plan, labels and agreed delivery scope

What your team providesWhat Arcaya returns at that stage
Cabinet fronts and drawer assemblies prepared for workshop review
Workshop preparation / California kitchen case study / Arcayaliving
02 / Support by role

Give each professional a relevant entry point.

  • Architects & interior designersFinish coordination, details and drawing review.
  • Dealers & cabinet studiosDefined ranges, samples, repeat orders and territory terms.
  • Developers & procurement teamsUnit schedules, revision control, packing and phased logistics.
Tell us how your team works
03 / Shared documents

Make the project easier to review.

  • Project brief and room schedule
  • Material and finish schedule
  • Drawing revision register
  • Approved sample record
  • Inspection and packing checklist
04 / Collaboration questions

Set expectations before the first order.

Use the first conversation to agree what your team will supply, which decisions need review and how the project will be measured, delivered and installed.

Can you work with our specifications?

Provide your drawings and specification schedule. The review should identify what can be offered, what needs clarification and where an alternative is proposed.

Who handles site measurement and installation?

Define these responsibilities in the project scope before final drawing approval. Availability depends on the destination and agreed service arrangement.

Are samples available?

Record the required finishes and destination. Sample availability, charges and shipping arrangements must be confirmed before ordering.

Your next step

Tell us how your team works.

Share your plans, priorities and destination market.

Start a project brief