Cabinetry capabilities from China, coordinated around your project.
Explore how materials, cabinet construction, specialist finishes and project coordination come together. Review the details that matter to your specification.
Arcaya coordinates production with manufacturing partners; partner workshops are shown as such, never as “our factory”.
Coordination you can hold someone to.
Arcaya specifies, sources, reviews and coordinates custom cabinetry made by manufacturing partners in China, and manages the project from brief to handover. Product scope and partner scope are stated per project, never summed into a capacity figure.
A chosen collection and finish become a manufacturable configuration: door profile, substrate, edge, hardware and countertop, each with a record.
Site dimensions, interfaces and the room schedule turn the configuration into approved drawings and a cabinet list.
Trial assembly, inspection, labeled packing and delivery against the approved revision.
Three parties, one table.
Proposed split for a typical project. Confirmed per project in the agreed scope.
Collection, configuration and material records; sample approval
Technical sheets, sample production
Design intent, finish references, site dimensions
Drawing review, revision register, cabinet list
Production drawings per approved revision
Approval of dimensions, interfaces, revisions
Release against the approved specification; checkpoints
Manufacture, trial assembly, in-house checks
Access to samples and inspection records
Inspection against drawings; packing list; issue log
Labeling, protection, packing to the plan
Acceptance criteria agreed in advance
Delivery scope, documents, follow-up
Packing documentation and replacements
Unloading, storage, installation unless agreed otherwise
The California kitchen as evidence.
One delivered product followed through drawings, trial assembly, inspection and delivery. Each stage has a document; the photographs are the partner’s workshop and the client’s site, labeled as such.




Arcaya · California marble-and-oak kitchen · arcayaliving.com · shoot dates to record per image.
Engineering, craftsmanship, quality, packing.




Make each cabinetry decision traceable.
China’s specialist cabinetry supply chain can be explored through the parts of a project: the cabinet box, door, surface, edge and functional fittings. The project brief should connect these choices in one agreed configuration, rather than treating a catalog image as a complete specification.
Component, core, assembly and fixing method; separate the cabinet box from the door construction.
Dimensioned drawings and the identified panel or component
Door profile, decorative surface, coating, grain direction and reverse side.
Labeled samples and the approved finish schedule
Panel edges, corners, end returns, handles and countertop junctions.
Sections and representative assembled details
Contents, clear dimensions, opening path, hardware model and service access.
Layout, fitting instructions and compatibility review
Room, cabinet and package references; agreed inspection and delivery responsibilities.
Approved revision, inspection record and packing list
Check the numbers before you specify.
Discuss your project requirements.
Choose the entry that matches your role; the brief and the collaboration terms follow from it.