Custom cabinetry, specified for professional projectsSpecification guideFor the tradeStart a project
ARCAYACABINETRY
Start a project
MenuClose
Downloads / Drawing readiness

A usable brief before a drawing file.

Download a three-page project worksheet to record the measured room, contents, visible materials, quote scope and handoff owners. It helps a designer and buyer discuss the same revision. Project-specific CAD or DXF details come later, after the actual system and interfaces are selected.

Printable PDFThree pagesNo account required
Open the project brief PDF
First page of the original Arcaya Cabinetry project brief worksheet with fields for room, survey and storage inventory
Original Arcaya printable worksheet preview. The PDF contains three pages for room, option and handoff decisions.
The available download

Arcaya Cabinetry Project Brief Worksheet (PDF, 3 pages). Print one copy per room or cabinet run. It is a blank working record; no personal information is submitted to this website by opening or printing the file. Only send a completed copy if you choose to contact us.

Open the printable PDF

01 / The three sheets

Move from room evidence to an issue-ready handoff.

Page 1 - Room and use
Identify the room or run, drawing revision, surveyed conditions, item groups and everyday access needs.
Page 2 - Comparable options
Record cabinet box and edge, fronts, fitting, visible finish, junctions, alternates and quotation assumptions.
Page 3 - Approval package
Check the plan, elevations, sections, selected samples, fitting documents, quote scope and site-readiness owners.

Leave unconfirmed entries blank and put the open question in the final log. A polished reference image is not proof of a selected component, a measured clearance or a current supply agreement.

Original Arcaya editorial diagram explaining cabinet box, edge and interface decisions
Use this original explanatory diagram to ask what cabinet construction details the real selected system and drawing must define.

Use the 30-point specification checklist Read the construction guide

02 / CAD and DXF requests

Ask for the right drawing, not a generic geometry file.

A reusable planning worksheet can be published openly; a fabrication or installation drawing cannot be treated as universal. A DXF may describe lines, but it does not establish the chosen board, hardware, fixing surface, services, tolerances or approval status. For a project-specific CAD/DXF request, provide the current measured plan and identify the intended product system and the details that need coordination.

Request only the drawing type needed for the current decision.
File or recordUseful forRequired context
Measured planRoom, openings, service and circulation referencesSurvey date and responsible measurer
Elevation / sectionCabinet zones, face alignment and junctionsRun IDs, revision and selected system
CAD / DXF extractProject geometry to coordinate with the teamPurpose, units, revision, scope and interface owner

Current availability: this public library does not offer a verified universal DXF pack or an Arcaya standard construction detail. Share a specific project brief to discuss which drawing files can be prepared or reviewed for that scope.

See the drawing-package guide Understand cabinet details

03 / Prepare the exchange

Send the record that helps the next person decide.

Send the current plan, a room ID, visible finish direction and storage inventory with the worksheet. Keep older revisions marked as superseded. When dimensions, site conditions, a service interface or a fitting remain unknown, name the person who will confirm them. This keeps a design discussion separate from a final manufacturing or site approval.

Original Arcaya editorial diagram of drawing revisions, site readiness and handoff owners
Original planning diagram: project-specific drawings, site records and agreed responsibilities govern the actual handoff.

Read the site-readiness guide Review the buyer handoff

Source and scope. The printable worksheet and preview are original Arcaya editorial materials. The two technical diagrams are original explanations, not construction drawings or evidence of a current hardware specification. This page does not promise a DXF deliverable, engineering approval, fixed price, MOQ, lead time or supply model.