Our process / Quality & inspection

Quality checks tied to
your approved specification.

Good cabinetry is judged as an assembly: doors meet evenly, drawers clear adjacent fronts, grain and color work across a run, and the parts arrive with an identifiable place in the project. Connect those checks to the approved drawings, finish sample and hardware schedule.

Cabinet run with drawers and an appliance opening during workshop preassembly
California kitchen case study / Arcayaliving
01 / Specification first, then records

Every check points at something approved.

A checkpoint without an approved reference is an opinion. Each record names the drawing revision, sample reference or hardware model it was checked against.

What is approved

  • Drawing revision and cabinet list
  • Finish sample reference and batch
  • Hardware manufacturer and model
  • Packing plan and labeling logic
  • Acceptance criteria agreed with the client

What is recorded

  • Inspection report per checkpoint
  • Deviations, actions and closure
  • Photographs with cabinet numbers
  • Packing list matched to packages
  • Issue log through delivery and follow-up
02 / Seven checkpoints

From incoming materials to packing.

01Incoming materials

Product codes and batches against the material record.

Record · codes, batch, sheet
02Dimensions

Cabinet and part sizes against the approved drawing.

Record · measured vs drawn
03Structure & joinery

Joints, back panels and fixings as specified.

Record · method, fixings
04Finish

Color, sheen and grain against the sample reference.

Record · sample ID, conditions
05Hardware

Model, quantity, fixing and operation.

Record · model, operation check
06Pre-assembly

Runs stood up; reveals, alignment and fit.

Record · photos by cabinet number
07Packing

Labels, protection and the packing list match.

Record · packing list, labels
03 / What, basis, record

Each checkpoint, in three columns.

CheckpointWhat is looked atBasisWhat is recorded
Incoming materials

Panels, veneers, hardware as delivered

Material record, supplier sheet, batch

Codes, batch references, documents

Dimensions

Overall and part sizes, cut-outs

Approved drawing revision and tolerances

Measured values against drawn

Structure & joinery

Joints, back panels, fixing method

Configuration record

Method and fixings used

Finish

Color, sheen, grain, edges

Sample reference, viewing conditions

Sample ID, date, conditions, result

Hardware

Model, quantity, operation

Hardware record, installation drawing

Model, count, operation check

Pre-assembly

Fit, reveals, alignment

Approved drawings

Photographs with cabinet numbers

Packing

Labels, protection, completeness

Packing plan and list

Packing list match, package numbers

04 / Record an issue clearly

Make an inspection finding actionable.

A useful issue record identifies the component, the approved reference, the observed difference and the evidence needed to close it.

Identify the component
Record the room, cabinet number and part, with an overall image showing its position.
State the comparison
Name the drawing revision, sample reference or hardware model used for the check.
Describe the finding
Use a measured value or a clear close-up where appropriate. Describe what is visible without guessing its cause.
Track the resolution
Record the agreed action, responsible contact and the follow-up evidence. Retain both the original and resolved condition in the project file.
05 / Samples, models and reports

What each document covers.

01Sample ↔ finish

A finish is checked against its numbered sample; the sample reference and batch travel with every room that uses it.

02Model ↔ hardware

Hardware is checked against the manufacturer’s model and installation drawing, never against a generic description.

03Report ↔ product

A test report applies to the exact panel or product it names. A single supplier report is not a brand-wide certification.

06 / Client acceptance and feedback

Agreed before shipment, followed after delivery.

Agree the acceptance record and the process for reporting issues before shipment. The scope of each inspection, report and follow-up service belongs in the project agreement.

  • Acceptance criteria agreed before release and shipment
  • Inspection report and packing list issued with the consignment
  • Damage or shortages reported with photographs and cabinet numbers
  • Replacement parts handled through the issue log
Your next step

Discuss inspection requirements.

Tell us the criteria your project needs and we confirm what is checked, against what, and how it is recorded.