Make the cabinet delivery handoff a written sequence.

An overseas cabinetry order crosses design approval, packing, transport and the receiving site. This guide identifies the records and decisions each party should settle before dispatch. The actual route, trade term, transport provider and installation scope belong to the project agreement.

Approved revisionNamed delivery pointReceiving owner
Follow the handoff sequence
Original Arcaya project brief worksheet with room, drawing revision and receiving responsibilities
Original Arcaya project brief. A numbered room and approved revision give the transport file something precise to reference.
01 / The handoff chain

Keep one identifier from the room drawing to the received package.

Assign room, run and cabinet IDs on the approved drawing. Carry the same IDs into the product list, package register, dispatch record and receiving notes. When a component changes, issue a dated revision and identify which older list it replaces. This gives a distributor, carrier and site team a common reference.

Four records linked by the same project and cabinet IDs.
StageRequired recordOpen decision
ApprovalPlan, elevations, finish and fitting scheduleWhich revision is released?
PackingPackage list mapped to room/run/cabinet IDsWhat is in each package?
MovementNamed point, carrier documents and condition recordWho arranges each leg?
ReceivingCount, condition, discrepancy and sign-off logWho accepts and reports?

Prepare the drawing package Open the blank project brief

02 / Allocation and movement

Name the place, the party and the charge.

If an Incoterms® 2020 rule is used, write the rule and its named place into the actual quotation or contract. Confirm who books transport, who arranges any insurance, which party handles export and import formalities, and who pays terminal, unloading and inland charges. The International Chamber of Commerce describes these rules as an allocation of cost, risk and obligations; its official checklist recommends clarifying loading, unloading, terminal and customs charges in the particular deal. Do not infer a term from a headline price.

Budget link. Use the buyer-entered landed-cost worksheet to record charges outside the seller quote. It does not calculate duties, taxes, freight or exchange rates. Check the current destination rules and the selected project terms with appropriate advisers.

Open the cost worksheet Compare quote scope

03 / Dispatch file

Design the packing register for the actual order.

The packing method depends on the approved components, journey, handling and receiving conditions. Ask for a project-specific list that identifies package count, room and cabinet IDs, orientation or handling notices where applicable, and the responsible party for condition photographs and discrepancy reporting.

Before dispatch
Match the approved product schedule and package register; document unresolved alternates.
At transfer
Record quantity and condition with the carrier and the applicable project documents.
At receiving
Keep package IDs, condition notes and missing-part questions together for the named receiving party.
Original Arcaya editorial diagram of the cabinet box, exposed edges and interfaces
Original explanatory diagram. The packaging and protection for a real order must be documented separately.

Review packing and delivery choices See the project process

04 / Arrival and installation

A delivered package is not an installed cabinet.

Before arrival, check the route from unloading point to room, service readiness, dry storage and who may receive and inspect goods. Keep the final installation method tied to the selected system’s current documents and the measured site; do not derive fixing, load or safety details from a photograph. Record the local installer, discrepancy route and final room sign-off in writing.

Original Arcaya diagram of approved documents, delivery access, room readiness and receiving team
Original site-readiness explanation; actual access, sequence and responsibilities must be confirmed for the project.

Read the site readiness guide Use the specification checklist

05 / Start the actual route plan

Send enough context to assign the next action.

Provide the destination country and receiving location, approximate project scope, room and cabinet drawings if available, required delivery point, access constraints and the person coordinating import and installation. Ask for the documents and responsibilities still missing. There is no universal dispatch date, fixed duty allowance, freight charge, lead time, insurance cover or warranty implied by this guide.

Share an overseas project brief Coordinate the site team

Source and scope. The trade-rule links lead to the International Chamber of Commerce. The PDF preview and two diagrams are original Arcaya editorial assets; they do not show a live shipment or selected supply system. Historic brand packing references were reviewed only for questions to ask and are not published as Arcaya operating evidence.