Plan how the cabinetry reaches the room.
Plan delivery around the parts that will arrive: cabinet assemblies, doors, glass, countertops, loose hardware and trim. Their size, fragility and installation sequence influence the packing format and the route from unloading point to finished room.

Three priorities for a clear brief.
Confirm which items are supplied assembled, partly assembled or as separate components. Ask for a packing list that can be matched to the cabinet schedule, with room names or cabinet references carried through to the labels. Identify separate doors, hardware, fillers, trim and other small components so they can be located during installation. Note glass, fragile finishes and shaped pieces when discussing the packing arrangement. Any special protection should be agreed for the actual items and transport plan.
Share the delivery address, available receiving hours and any access restrictions. Review the unloading location, vehicle access, doorways, stairs, lifts and the largest assembly to be moved. Identify who provides unloading labor or equipment and who moves the items inside. Arrange a suitable staging area before arrival, with enough space to identify packages without blocking installation routes. Tell the project team if the site will still be under construction or if delivery needs to be split by room or phase.
Nominate the person who will receive the shipment and compare it with the packing list. Agree how visible damage, missing packages or unexpected items should be documented and reported. Keep cabinet references visible while parts are staged and avoid separating labeled hardware from its related items. Before installation begins, clarify which drawings, assembly information and remaining site checks the installer needs. Record questions and discrepancies so they can be resolved against the approved order rather than memory.
Different components need different handling plans.
Use the cabinet schedule to identify the parts before discussing boxes and crates. These California kitchen references show assemblies and details that need to stay connected to the project record.



Keep decisions and responsibilities visible.
Use this record to identify what is agreed and what still needs a drawing, sample or confirmation.
Assembled or component form; special protection
Packing and project contacts
Package list, room names and cabinet references
Sender and receiving contact
Route, delivery point and included services
Transport coordinator
Receiving hours, lifting needs and storage area
Site team and unloading contact
Drawings, assembly information and issue reporting
Installer and project contact
Keep the cabinet reference through the handover.
Temporary labels connect a visible part with its cabinet position. Carry that identification into the package list and retain it until the correct unit has been located on site.
- Cabinet reference
- Use the same room and unit reference on drawings, package lists and component labels.
- Loose parts
- Identify shelves, hardware and trim by the cabinet they belong to, and record where they are packed.
- Site reconciliation
- Check the received parts against the package list and record shortages or damage before installation.
Prepare a clear delivery file
Ask which documents will be supplied and who will maintain them. A practical handover file can include:
- 01
- The approved cabinet list and latest relevant drawings.
- 02
- A package list that maps to room or cabinet references.
- 03
- The agreed packing arrangement for fragile or unusual items.
- 04
- Delivery and receiving contacts, access notes and unloading responsibilities.
- 05
- Available assembly information and separately packed hardware references.
- 06
- A receiving record with package counts, photographs and any reported discrepancies.
Questions about packing & delivery planning.
Does delivery include unloading and installation?
That depends on the written scope for the project. Confirm the delivery point, unloading, movement inside the building and installation separately, including who provides labor and equipment. Do not rely on the word delivery alone to describe all of these tasks.
When should packing and access be discussed?
Raise them while the cabinet arrangement is being developed. A large assembly, curved end or glass panel may influence how items are handled and moved through the site. Review the final arrangement again before dispatch.
What should the receiving contact check?
Compare package counts and references with the supplied list, inspect accessible packaging for visible issues, and document discrepancies using the agreed reporting process. Keep the relevant labels and records available for the project team and installer.
Prepare the next project conversation.
Include the destination, site access and installation arrangements in your project brief so the delivery scope can be discussed clearly.