Establish one room record
Draw a simple plan and give each wall a reference. Mark the view direction of photographs so someone working remotely can connect a picture to the plan. Record the date, measuring units and whether dimensions describe bare construction or finished surfaces. Keep one current survey issue rather than several competing sketches.
Measure complete wall runs as well as the segments between openings. Reconcile the segments with the overall dimension before sending the record. An unexplained mismatch is useful information to resolve, not a reason to quietly adjust one number. A quotation can begin from provisional information, but that status must remain visible until verification.

Record the room in three dimensions
A plan alone cannot describe a sloping ceiling, an uneven floor or a window that affects a countertop. Record relevant heights and the locations at which they were taken. Show beams, columns, bulkheads and any other projection that can meet the cabinets or their installation route.
Ask the surveyor to check wall straightness, corners and floor or ceiling variation using the appropriate method. The cabinet designer can then plan fillers, scribes and installation allowances deliberately. Do not convert every nominal room dimension into an equally tight cabinet dimension; the approved design needs to account for the actual building and the installation method.

Map windows, doors and circulation
Show opening widths, positions and relevant trim projections. Include door swing, handles, window operation and the finished sill where it affects the cabinet or faucet. Photograph details beside a measurement reference where a written dimension alone is hard to interpret.
Mark the routes through the kitchen and the rooms it connects. An island position can affect access to a terrace or dining room even when it fits between the cabinet runs. Record these relationships before choosing a layout. Our kitchen layout planning guide explains how to turn the measured shell into working and circulation zones.

Give services and appliances their own schedule
Locate visible plumbing, power and other relevant services against clear room references. Note whether their final positions are confirmed. Have the appropriate local trades verify requirements and any proposed changes. A photograph of a socket is useful context but does not establish the final appliance connection or ventilation requirement.
List actual appliance model references and obtain the manufacturer's current installation information. Distinguish an appliance's outer dimensions from the opening, ventilation, front movement and service access it needs. If an appliance has not been chosen, mark its space provisional and assign a decision owner. Avoid designing around a generic internet product image.

Check the route into the building
Record the narrowest or most awkward points along the delivery route: entrances, stairs, lifts, turns and room doorways. Consider the largest packed cabinet or panel, including the space needed to handle it. Ask who will check the route against the final shipping format.
A tall unit may fit its final location but require a different assembly plan to reach it. Resolve that relationship with the installer and supplier before production. The same review should identify a dry receiving area, any building delivery restrictions and responsibility for unloading. Read packing and shipping alongside the survey rather than waiting until the order is ready to leave.

Issue a survey package that can be approved
Send the plan, elevations or relevant sections, service schedule and numbered photographs together. Add an open-items list naming every missing dimension, unselected appliance and unfinished surface that can affect the design. Identify who will confirm each entry and when that information must reach the drawing team.
At approval, compare the shop drawings with the verified survey and the actual product information. Check revisions after a site change. The cabinet quote template can organize the schedule, but it does not replace the local survey or production drawings. A clear handover is one in which the next person can distinguish measured facts, design choices and unresolved assumptions immediately.

Questions before approval
Can I use a builder's old plan?
Use it as background, then verify the conditions relevant to the cabinet order. Changes to finishes, services or openings need to reach the approved survey and shop drawings.
Should I send inches or millimeters?
Agree the drawing units with the team and label them on every record. If conversion is required, retain the original observation and check the converted production information carefully.
Can photographs replace dimensions?
Photographs explain context and detail. They should accompany a measured record; perspective and an unknown scale make them unsuitable as the sole basis for production dimensions.